Project Portfolio
All Projects
The full range of Hollaender work — architectural railing systems and Speed-Rail® installations across every market and application.
Project Portfolio
The full range of Hollaender work — architectural railing systems and Speed-Rail® installations across every market and application.


Hollaender railing systems deliver safety, accessibility, and lasting performance across a variety of stadium environments. Interna-Rail®, ADA-compliant handrails, and durable metal infill options provide flexible solutions for high-traffic public venues.
Systems Used:

Skyzone™ is the international market leader in trampoline parks, with over 130 parks in the U.S., Canada, Australia, Latin American & Europe. In early 2013, Skyzone corporate decided they needed to standardize on a railing system, for both branding and cost purposes. The practice to that time had been to let franchise partners source locally fabricated railing giving each park a different look. The purchasing power of potentially multiple parks per year would be far greater than that of a single park, and Skyzone wanted a more uniform branding strategy.
Systems Used:

The New Athens Recreational Center located in Athens, Alabama provided the perfect application for Hollaender’s 3-Line Interna-Rail® with a custom perforated panel infill. The 72,000 square-foot, two-story recreation center offers three-lane walking/running track, three basket-ball courts, a lobby, offices and other amenities.
Systems Used:

The Broussard Sport Complex is a new sports complex catering to multiple amateur sports in the Broussard area, such as baseball and soccer.
Systems Used:

Josh Held, President of Josh Held Design, was invited by the LIGHT Group in Las Vegas to design the new 38,000 square foot nightclub located in Las Vegas. The concept focused on a “warehouse feel with industrial influences.” Nightclubs in Las Vegas are one of the most extreme environments in hospitality design and have to withstand high capacity, traffic and abuse.
Systems Used:

Boston’s Joseph and Clementine Langone Park was due for a major overhaul since opening in 1973. The architects at Weston and Sampson specified Hollaender’s Interna-Rail® system for the makeover. Using nearly 700 linear feet of Hollaender’s aluminum three-line rail layout with wire mesh infill panels, the railing design would ensure the guardrail along the Boston Harborwalk was up to present-day codes while allowing visitors to enjoy the amazing views of the city’s waterfront and Charlestown Bridge.
Systems Used:

The architects of Silverman Trykowski Associates in Boston, Massachusetts were chosen to design the Greentown Labs Corporate Headquarters in Somerville, Massachusetts. Greentown Lab’s new facility is the World’s Largest Cleantech Incubator. The space includes research and development office space, outdoor and indoor presentation spaces, and maker space for prototyping.
Systems Used:

Frankie’s Fun Park opened their fifth location in Huntersville, North Carolina and called upon ADW Architects to design the facility. The combination of amusement rides, exhibits, dining and outdoor accessibility required various railing designs and products. As a full-line manufacturer with complete engineering and design services, Hollaender Manufacturing provided railing for all of Frankie’s design and utility needs. Frankie’s needed a “one-stop shop” for their complete railing system needs and Hollaender’s mechanically fastened aluminum railing systems covered all their requirements. The design required Hollaender's aluminum Speed-Rail® 2-line queue railing, Speed-Rail® with perforated infill panels, Interna-Rail® ADA accessible ramp railings and Interna-Rail® with acrylic panels. Hollaender railing systems are showcased at Frankie’s other South Carolina locations in North Charleston, Greenville, and Columbia and continue to serve the staff and patrons of Frankie’s well.
Systems Used:

The Jordan-Newby Anchor Branch at Broad Creek is the most recent branch in the Norfolk Public Library system, opened June 2018.
Systems Used:

Raydeo Enterprises of Ballground, Georgia was chosen by Holder-Austin-Moody-Bryson, a joint venture of Holder Construction Group, Austin Commercial, Moody Construction Co. and Bryson Constructors to complete the railing construction for the Atlanta Hartsfield-Jackson newest parking deck.
Systems Used:
