1-800-772-8800Toll Free
80 Years of American Manufacturing Excellence
Made in USA
Hollaender
Hollaender

Leading manufacturer of architectural railing systems since 1946.

Products

  • Speed-Rail® Fittings
  • Architectural Railing
  • Product Catalog
  • Infill Options

Resources

  • Catalog & Documents
  • CEU Courses
  • Case Studies
  • Finish Options
  • FAQ

Company

  • Our Story
  • Applications
  • Request a Quote
  • Contact Us

© 2026 Hollaender Manufacturing Company. All rights reserved..

Privacy PolicyTerms of ServiceSitemap

More Work

Similar Projects

View All
First Internet Bank
Featured
Fishers, IN

First Internet Bank

The Indianapolis, Indiana, based offices of Browning Day and specialty railing contractor, Spohn Associates, collaborated to create an amazing architectural designed space for the First Internet Bank in Indianapolis, Indiana. The project required over 3,500 linear feet of railing and incorporated a veritable plethora of Hollaender railing designs.

Systems Used:

QUAD Button Mounted GlassSmoke Baffles+4 more
Details →
PHILADELPHIA NAVAL SHIPYARD
Philadelphia, PA

PHILADELPHIA NAVAL SHIPYARD

This old shipyard, along the banks of the Delaware River, was not accessible by the public due to the 2-line railing that had been there for many years.

Systems Used:

Speed-Rail®
Details →
HAMMELS WYE - NYTA
Rockaway, NY

HAMMELS WYE - NYTA

The New York Metropolitan Transportation Authority (MTA) completed the restoration of the Hammels Wye Viaduct, a critical rail junction on the Rockaway Line, as part of the Rockaway Line Resiliency and Rehabilitation Project.

Systems Used:

Speed-Rail®
Details →
St. Louis Blues NHL Arena
St. Louis, MO

St. Louis Blues NHL Arena

Infill

Glass

Material

Aluminum

Application

Public Infrastructure

Finish

Clear Anodized

Project Overview

Tasked with a major renovation of the home of the St. Louis Blues NHL Hockey Team, Paric Construction selected the Hollaender™ structural glass railing system for the railing in the arena’s exclusive theater box area.

Tasked with a major renovation of the home of the St. Louis Blues NHL Hockey Team, Paric Construction selected the Hollaender™ structural glass railing system for the railing in the arena’s exclusive theater box area. This job was unique in its need for fast execution. Time taken between placement of order and completed installation of over 500 linear ft. of railing was 8 weeks. Hollaender was able to assist in expediting the project in two critical areas: 1. The PanelGrip2® dry glaze shoe system improved installation productivity greatly vs. a traditional wet glaze shoe system that requires grout. Setup time is not required for grout to set. In addition, there were times that existing glass lites that had already been set needed to be removed to allow passage of material. 2. The original specification called for an anchoring system that required anchors on 8 inch centers in order to meet building code. Hollaender was able to use its proprietary anchor mounting software from Hilti to design an anchoring system that required anchors on 16 inch centers. This not only reduced cost and lead time of the base shoe, it greatly reduced the time needed to install anchors. Comments from Paric Project Team on this project: “Hollaender’s help in engineering a revised anchoring system and the overall faster install time of the PanelGrip2® dry glaze shoe assisted Paric in meeting the extremely tight construction schedule on this project.”

Case Study

St. Louis Blues NHL Arena Case Study

System

Structural Glass

Project Gallery

Structural Glass Railing by Hollaender
1/4