Project Portfolio
All Projects
The full range of Hollaender work — architectural railing systems and Speed-Rail® installations across every market and application.
Project Portfolio
The full range of Hollaender work — architectural railing systems and Speed-Rail® installations across every market and application.


Hollaender railing systems deliver safety, accessibility, and lasting performance across a variety of stadium environments. Interna-Rail®, ADA-compliant handrails, and durable metal infill options provide flexible solutions for high-traffic public venues.
Systems Used:

Hollaender’s Interna-Rail® system brings durability and distinctive color to the Pelham Recreation Center. Clear-anodized frames and Moss Green powder-coated steel wire mesh create a strong, open railing solution for the active recreational facility.
Systems Used:

West Liberty University decided to install a new press box at their football stadium requiring a new railing system.
Systems Used:

The Broussard Sport Complex is a new sports complex catering to multiple amateur sports in the Broussard area, such as baseball and soccer.
Systems Used:

Josh Held, President of Josh Held Design, was invited by the LIGHT Group in Las Vegas to design the new 38,000 square foot nightclub located in Las Vegas. The concept focused on a “warehouse feel with industrial influences.” Nightclubs in Las Vegas are one of the most extreme environments in hospitality design and have to withstand high capacity, traffic and abuse.
Systems Used:

Boston’s Joseph and Clementine Langone Park was due for a major overhaul since opening in 1973. The architects at Weston and Sampson specified Hollaender’s Interna-Rail® system for the makeover. Using nearly 700 linear feet of Hollaender’s aluminum three-line rail layout with wire mesh infill panels, the railing design would ensure the guardrail along the Boston Harborwalk was up to present-day codes while allowing visitors to enjoy the amazing views of the city’s waterfront and Charlestown Bridge.
Systems Used:

Indiana University’s Memorial Stadium was due for a redesign of the railing system, which was contracted to RATIO and SmithGroup for design. The design concept was complex, calling for glass railing that was both shoe mounted and post mounted, as well as wire mesh infill panel railing. The original design called for a series of custom post shapes that were unique, but more expensive than the budget could bear.
Systems Used:

With over 2 miles of shoreline, Hammonasset Beach is the largest beachfront park in the state of Connecticut.
Systems Used:

The architects of Silverman Trykowski Associates in Boston, Massachusetts were chosen to design the Greentown Labs Corporate Headquarters in Somerville, Massachusetts. Greentown Lab’s new facility is the World’s Largest Cleantech Incubator. The space includes research and development office space, outdoor and indoor presentation spaces, and maker space for prototyping.
Systems Used:

The Battery Atlanta is a lifestyle destination anchored by SunTrust Park, the new home of the Atlanta Braves.
Systems Used:

Raydeo Enterprises of Ballground, Georgia was chosen by Holder-Austin-Moody-Bryson, a joint venture of Holder Construction Group, Austin Commercial, Moody Construction Co. and Bryson Constructors to complete the railing construction for the Atlanta Hartsfield-Jackson newest parking deck.
Systems Used:
