Project Portfolio
All Projects
The full range of Hollaender work — architectural railing systems and Speed-Rail® installations across every market and application.
Project Portfolio
The full range of Hollaender work — architectural railing systems and Speed-Rail® installations across every market and application.

Structural glass railing brings openness and contemporary style to the Ascension project. Half-inch monolithic glass, coated aluminum cladding, and a stainless-steel assist rail create a durable, refined architectural solution.
Systems Used:

HMS Architects of New Orleans was tasked by Oschner Medical Centers to design a new campus for their facility located in Kenner, Louisiana. One of their concerns involved exterior guardrail on a down ramp. Due to corrosion and high maintenance, both Oschner and HMS have had issues with traditional welded and painted steel systems in the past. They have observed that repainting the top rails of painted railing costs from $5 to $10 per linear foot every three to five years.
Systems Used:

The Cottages of Overton County is a senior nursing home residence facility located in Livingston, Tennessee. Architect Greg Lusk of Lewis Group Architects was tasked with an interesting challenge.
Systems Used:

The Dr. Earl D. and Melanie N. Brooks College of Health Professions at Trine University’s Ft. Wayne campus, features an elegant railing system designed by Ft. Wayne based Design CollaboraƟve, with supply and installaƟon managed by Spohn Associates of Indianapolis.
Systems Used:


