Project Portfolio
All Projects
The full range of Hollaender work — architectural railing systems and Speed-Rail® installations across every market and application.
Project Portfolio
The full range of Hollaender work — architectural railing systems and Speed-Rail® installations across every market and application.

FeaturedThe Indianapolis, Indiana, based offices of Browning Day and specialty railing contractor, Spohn Associates, collaborated to create an amazing architectural designed space for the First Internet Bank in Indianapolis, Indiana. The project required over 3,500 linear feet of railing and incorporated a veritable plethora of Hollaender railing designs.
Systems Used:

Hollaender’s VISION™ stainless-steel railing system brings openness and refined modern style to this Cincinnati office building. Glass infill and a #4 directional satin finish create a durable, polished solution for the contemporary workplace.
Systems Used:

The Highlander Accelerator is a new community building aimed at servicing the newly developed Highlander community in North Omaha, Nebraska.
Systems Used:

When Purdue University required a world-class design for Hagle Hall, the home of Purdue’s Orchestras and All-American Marching Band, they called upon Browning Day Architects of Indianapolis, Indiana. The Stainless Steel Post Mounted VISION™ railing system was the perfect design accent to the facility’s modern aesthetic and open floorplan.
Systems Used:

Indiana University’s Memorial Stadium was due for a redesign of the railing system, which was contracted to RATIO and SmithGroup for design. The design concept was complex, calling for glass railing that was both shoe mounted and post mounted, as well as wire mesh infill panel railing. The original design called for a series of custom post shapes that were unique, but more expensive than the budget could bear.
Systems Used:

The Battery Atlanta is a lifestyle destination anchored by SunTrust Park, the new home of the Atlanta Braves.
Systems Used:

Located north of the Ohio State University in Columbus, Ohio, the six-story mixed-use University City Center building integrates 266 residential units and a pool, a 4-tier parking garage, and over 120,000 square feet of leasable retail space. In an effort to differentiate University City Center from other student housing options, the architect firm Berardi+ and specialty railing contractor Spohn Associates used Hollaender’s Interna-Rail VUE™ railing system to provide a clear and safe viewing area around the pool deck.
Systems Used:
